
Stable Lead Time Ess Thermal Cycling Chamber for PV Module Tesing
Guangdong Komeg Industrial Co., Ltd.- Power Supply:380V ,220V
- Certification:CE, ISO
- Warranty:1 Year
- Working Chamber Volume:225L
- Temp. Rate of Change:10 Oc,Min
- Temp. Range:-70oc~+100oc(Rapid Temp. Change -40oc~+85ocfull Li
Base Info
- Model NO.:ESS225L-C10
- Temp. Constancy:+,-3.0oc
- Heater:Iron-Chrome Wire Heater
- Compressor:France Imported Tecumseh Semi-Hermetic Compressor
- Blower:Centerifugal Blower
- Power:AC380+,-10% 50Hz 3phase4wires+Groud Wires
- Standard Accessories:Sight Window, Cable Port, Baffle, Baffle Frame*2
- Control System:Balanced Temperature & Humidity Control System
- Transport Package:Strong Plywood Case, Meet International Standard
- Specification:Standard and Customized
- Trademark:KOMEG
- Origin:Dongguan, China
- HS Code:90321000
- Production Capacity:1000 Sets,Year
Description
1. We reserve the right to change specifications without prior notice
2. Customized sizes and configurations available
3. ESS Test Chambers Application on Solar Panel PV Module Industrial:
Solar Panel Test Conditions is as below:
Thermal Cycle Test Profile
Suggested Test Profile:
Step 1: Ramp from ambient to -40 ºC (100 ºC/hr max on the module, or 39 minutes) (UL ramp is air temp.)
Step 2:Hold -40 ºC for 10 minutes minimum (±2 ºC)
Step 3: Ramp to 85 ºC (100 ºC/hr max on the module, or 75 minutes) (UL 90 ºC, the ramp is air temp.)
Step 4: Hold at 85 ºC for 10 minutes minimum (±2 ºC) (UL 90ºC)
Step 5: Ramp to 23 ºC(100 ºC/hr max on the module, or 36 minutes) (UL ramp is air temp.)
Step 6: Go to step 1. Cycle 50 or 200 times. (UL 200 times)
Testing time:
Note: Total time per cycle is not to exceed six hours.
Fastest cycle time is 170 minutes/2.8hours (ramping at 100 ºC/hr)
Slowest cycle time is 360 minutes/6hours (ramping at 44 ºC/hr)
Total test time: Maximum ramp rate: 6 days or 24 hours.
Humidity-Freeze Test Profile
Suggested test profile:
Step 1: Ramp from ambient to 85 ºC/85%(100 ºC/hr max on the module, 36 minutes)
Step 2: Hold 85/85 for 20 hours minimum (±2 ºC, ±5%)
Step 3: Turn off humidity control. Ramp to 0 ºC (100 ºC/hr max on the module, 51 minutes)
Step 4: Ramp to -40 ºC (200 ºC/hr max on the module, 12 minutes)
Step 5: Hold -40 for 0.5 hours (±2 ºC, 30 minutes)
Step 6: Ramp to 0 ºC (200 ºC/hr max on the module, 12 minutes)
Step 7: Ramp to 23 ºC(100 ºC/hr max on the module, 51 minutes)
Step 8: Go to step 2. End test after ten cycles.
Note:
The maximum total time for steps 3 to 7, plus step 1, is four hours.
The minimum time possible is 156 minutes or 2.6 hours.
Total test time: 9.4 - 10 days
We have a professional after-sales service team, to ensure quick response with experienced advice, solutions, etc.Actually we will prepare all the spare parts (maybe needed) for 3 years(negotiable), which will be delivered together with the test chamber.
