Test Instrument

Quality Rapid-Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial Tesing

Guangdong Komeg Industrial Co., Ltd.
  • Power Supply:380V ,220V
  • Certification:CE, ISO
  • Warranty:1 Year
  • Working Chamber Volume:225L
  • Temp. Rate of Change:10 Oc,Min
  • Temp. Range:-70oc~+100oc(Rapid Temp. Change -40oc~+85ocfull Li

Base Info

  • Model NO.:ESS1000L-C10
  • Temp. Constancy:+,-3.0oc
  • Heater:Iron-Chrome Wire Heater
  • Compressor:France Imported Tecumseh Semi-Hermetic Compressor
  • Blower:Centerifugal Blower
  • Power:AC380+,-10% 50Hz 3phase4wires+Groud Wires
  • Standard Accessories:Sight Window, Cable Port, Baffle, Baffle Frame*2
  • Control System:Balanced Temperature & Humidity Control System
  • Transport Package:Strong Plywood Case, Meet International Standard
  • Specification:Standard and Customized
  • Trademark:KOMEG
  • Origin:Dongguan, China
  • HS Code:90321000
  • Production Capacity:1000 Sets,Year

Description

Model

ESS-SL

1000SL15

Working Chamber Volume(L)

1000L

Temp Rate of Change(  ºC /Min)

15 ºC /Min

Temperature Range

 -70 ºC~+100 ºC( Rapid Temp Change -55 ºC~+85 ºC Full Linear Control)

Humidity Constancy

±0.5 ºC

Temp Constancy

±3.0 ºC

Exterior Material

Cold-rolled steel sheet (Rustproof & Plastic Spray treated )/ Stainless Steel

Interior Material

Stainless Steel Plate(SUS 304)

Insulation Material

Rigid Polyurethane Foam

Safety Devices

overpressure, overheat, and over current protection for compressor, over temp. protection,

Compressor

Semi-Hermetic Compressor

Cooling Mode

Water Cooled

Control system

Balanced Temperature & Humidity Control System(BTC type)

Heater

Iron-chrome wire heater

Blower

Centrifugal Blower

Observation Window

Glass incorporating heat generator

Temp Sensor

Pt-100

Controller

Touch screen programmable controller

Ambient Temp.

+5ºC~+35ºC

Power

AC 380V/50Hz 3phase 5 wires+ ground wire

Note:
1. We reserve the right to change specifications without prior notice
2. Customized sizes and configurations available

4. ESS Test Chambers Application on Solar Panel PV Module Industrial:
 
Solar Panel Test Conditions is as below:
 
Thermal Cycle Test Profile

Suggested Test Profile:
Step 1: Ramp from ambient to -40 ºC (100 ºC/hr max on the module, or 39 minutes) (UL ramp is air temp.)
Step 2: Hold -40 ºC for 10 minutes minimum (±2 ºC)
Step 3: Ramp to 85 ºC (100 ºC/hr max on the module, or 75 minutes) (UL 90 ºC, the ramp is air temp.)
Step 4: Hold at 85 ºC for 10 minutes minimum (±2 ºC) (UL 90ºC)
Step 5: Ramp to 23 ºC(100 ºC/hr max on the module, or 36 minutes) (UL ramp is air temp.)
Step 6: Go to step 1. Cycle 50 or 200 times.(UL 200 times)
 
Testing time:
Note: Total time per cycle is not to exceed six hours.
Fastest cycle time is 170 minutes/2.8hours (ramping at 100 ºC/hr)
Slowest cycle time is 360 minutes/6hours (ramping at 44 ºC/hr)
 
Total test time: Maximum ramp rate: 6 days or 24 hours.
 
Humidity-Freeze Test Profile
Suggested test profile:
Step 1: Ramp from ambient to 85 ºC/85%(100 ºC/hr max on the module, 36 minutes)
Step 2: Hold 85/85 for 20 hours minimum (±2 ºC, ±5%)
Step 3: Turn off humidity control. Ramp to 0 ºC (100 ºC/hr max on the module, 51 minutes)
Step 4: Ramp to -40 ºC (200 ºC/hr max on the module, 12 minutes)
Step 5: Hold -40 for 0.5 hours (±2 ºC, 30 minutes)
Step 6: Ramp to 0 ºC (200 ºC/hr max on the module, 12 minutes)
Step 7: Ramp to 23 ºC(100 ºC/hr max on the module, 51 minutes)
Step 8: Go to step 2. End test after ten cycles.
 
Note:
The maximum total time for steps 3 to 7, plus step 1, is four hours.
The minimum time possible is 156 minutes or 2.6 hours.
 
Total test time: 9.4 - 10 days
Quality Rapid-Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial TesingQuality Rapid-Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial TesingQuality Rapid-Rate Thermal Cycling Chamber for Solar Panel PV Module Industrial TesingAfter-sale warranty:

We have a professional after-sales service team, to ensure a quick response with experienced advice, solutions, etc.Actually we will prepare all the spare parts (maybe needed) for 3 years(negotiable), which will be delivered together with the test chamber.