Test Instrument

Testing Equipment Secondary Injection Single Phase Relay Protection Tester

Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.
  • Time Measurement:1ms-9999s,1ms
  • Warranty:12month
  • Setting Range AC:1*0~10A
  • Power AC:1*1000va,W
  • Power DC:1*80va,W
  • Switch Parameters Input:1 Channel

Base Info

  • Model NO.:GDJB-III
  • Switch Parameters Output:1 Channel
  • Time Measurment:1ms~9999s,1ms
  • Transport Package:Standard Wooden Case
  • Trademark:GOLD
  • Origin:Chongqing China(Mainland)
  • HS Code:9031809090
  • Production Capacity:500pieces,Month

Description

AC short circuit voltage analog outputDC voltage selection output(it can be used as the operation power of static relay)OutputVoltage24V,48V,110V,220V,all the output current is 0.4ADevice precision0.5 gradeJoint action time test0~9999sResolution1ms.Power supplyAC220V+/-10%, 50Hz/60Hz;Environment temperature0-50 centigrade;Size550mm*410mm*340mmWeight33kg
Testing Equipment Secondary Injection Single Phase Relay Protection Tester

company information
 

                     CHONGQING GOLD MECHANICAL & ELECTRICAL EQUIPMENT CO., LTD

        Testing Equipment Secondary Injection Single Phase Relay Protection Tester

Chongqing Gold Mechanical & Electrical Equipment Co.,Ltd.  mainly design and manufacture the oil purifier and electrical testing equipment for more than 10 years.

After several years' development, our products have become high intelligent and wide coverage. And our company has become one of the leading manufacturer of oil purifier and electrical testing equipment in China;

We have developed sales channels in many countries such as UAE, Saudi Arabia, Iran, Malaysia, Thailand, Pakistan, India, Germany, Belgium, USA, Mexico, Kenya, Nigeria, South Africa and other countries worldwide.

And we have gained strong advantage and high reputation in international market.

We have persisted on the business idea of "Integrity Basis and Quality First" for the stable and constant development. We are making effort to develop together with customers from both domestic and abroad on the basis of reciprocity. Client, quality and service are our supreme target!

 Overseas exhibition

Testing Equipment Secondary Injection Single Phase Relay Protection Tester

 

 Our Services

Pre-sale Service:

♣Inquiry will be replied within 24 hours. 

♣Welcome to visit our factory. 

♣Technical datas and operation manual sent for evaluation.

After-sale Service:

♣Training how to install the machine, training how to use the machine at our factory.

♣Engineers available to service machinery overseas at customers' cost.

 Payment

Testing Equipment Secondary Injection Single Phase Relay Protection Tester.

FAQ

  • What's the delivery lead time?

"For most of the products, delivery lead time is 10 days after the order is confirmed; For some customized products, please check with the sales person."

  • What's the payment term?

"For total amount below USD3,000.0, payment term is 100% T/T as deposit; For total amount above USD3,000.0, payment term is 30% T/T as deposit, the balance before delivery; The payment term is also negotiable."

  • What's the warranty period?

"Warranty period is 1 year"